Use the Düsseldorf height scenario to test the value of projected energy against extra installation and service costs, without treating forecasts as meter data.
The supplied MOVEAIR Düsseldorf real-estate scenario illustrates a commercial question: how much additional value might a higher installation position create, and what extra cost could that value support? It is useful as a sensitivity exercise when its projected outputs remain clearly labelled.
The source describes a 10 kW wind system with twenty turbines and projects approximately 7,000 kWh annually at 15 metres, 11,000 kWh at 30 metres and 16,000 kWh at 70 metres. These are scenario figures from the supplied case-study deck, not verified rooftop meter records or a promise for another building.
Translate the scenario into comparable quantities
Start by preserving the system size, time period and output boundary used in the comparison. If one option later uses a different rotor, converter or operating restriction, it is no longer a pure comparison of installation positions. The assumptions should be revised explicitly.
For a 10 kW system over a 365-day year, the three source outputs imply approximate capacity factors of 8.0%, 12.6% and 18.3%. These are derived ratios for the projected scenario. They do not independently validate the underlying wind model.
Scenario height | Projected annual output | Gross annual value at an assumed EUR 0.20/kWh |
|---|---|---|
15 m | 7,000 kWh | EUR 1,400 |
30 m | 11,000 kWh | EUR 2,200 |
70 m | 16,000 kWh | EUR 3,200 |
The energy value is an analytical assumption, not a current tariff. It also assumes every projected kilowatt-hour has the same value. That assumption should be replaced by the building's actual consumption, export arrangements and operating schedule before an investment decision.
Compare the incremental benefit with incremental cost
Moving from the 15 m scenario to 30 m adds 4,000 projected kWh per year. Moving from 30 m to 70 m adds 5,000. At the assumed EUR 0.20/kWh, those increments are worth EUR 800 and EUR 1,000 annually before additional costs.
Suppose, purely for illustration, the higher of the latter two options requires EUR 400 more annual access and service expenditure. Its incremental annual operating benefit falls to EUR 600 before financing, tax, replacements and other differences. A ten-year undiscounted total would then be EUR 6,000, not EUR 10,000. Discounting and future changes would alter the result further.
This does not establish an acceptable purchase price. It shows why a higher energy forecast must be paired with the cost of achieving and maintaining that position. Extra cabling, structural work, lifting requirements and roof access can consume the apparent advantage.
Include any discontinuities. A position that requires a specialist access method may have a substantially different service cost from one reached through an existing roof route. Treating access cost as proportional to height can miss that change.
Replace a flat energy price with useful delivery
The building may consume much of its electricity during working hours, while generation follows weather. Some output can offset purchases, some can be exported and some may be constrained by the electrical system. Assign value to those routes separately.
For another invented example, take the 16,000 kWh projection and assume 75% is used locally at EUR 0.20/kWh, with the remaining 25% exported at EUR 0.06/kWh. Gross annual value becomes EUR 2,640 rather than EUR 3,200. The calculation uses 12,000 kWh of local use and 4,000 kWh of export; neither fraction is a measured Düsseldorf result.
A battery could change timing, but it introduces capital cost, conversion losses, operating limits and replacement needs. Compare that addition separately. Do not assume that storage converts every exported or curtailed kilowatt-hour into full retail-value electricity.
Use a survey to test the assumptions that change the decision
The next survey should focus on whether the proposed positions have the wind conditions, structural suitability and access characteristics assumed by the model. A height label alone does not describe rooftop flow. Building geometry, nearby obstructions and wind direction can change the comparison.
Require the energy assessor to identify the measurement source, transfer method, turbine curve, losses and uncertainty. Ask which assumptions dominate the difference between the options. If the decision reverses after a modest change in yield or maintenance cost, that uncertainty deserves attention before procurement.
The mounting-height engineering example addresses the wind-resource mechanism. This commercial comparison adds a separate question: whether the incremental useful electricity is worth the incremental infrastructure obligation.
Present a decision range rather than a winning height
A useful decision paper shows each option under lower, central and higher useful-energy assumptions, with the relevant installation and service costs beside it. It also identifies approvals or physical constraints that could remove an option entirely. The preferred height should emerge from that complete comparison.
Keep the landlord-and-tenant allocation visible. The party paying for installation may not receive all the energy savings, and a future roof intervention can shift costs between parties. The commercial rooftop checklist helps resolve those responsibilities.
The Düsseldorf material is most useful as a model that exposes sensitivity. It does not establish a universal economic rule that higher is always better. A defensible project selects a position whose useful output, access requirements and commercial arrangements remain attractive together, with the uncertainty in the original projections still visible.
Source notes: MOVEAIR - Use Case Studies.pdf (CASE). PDF references: CASE p18. These supplied manufacturer materials describe proposals, examples and product generations; they are not independent verification of current performance. Calculations explicitly labelled illustrative are analytical examples.
Image: Office tower shown with the supplied Düsseldorf scenario; scenario outputs are projections rather than independent measurements. Source: CASE, PDF p18.
By Dr. Aleksander Stefanowicz. Disclosure: Aleksander Stefanowicz has a professional relationship with MOVEAIR. This is an affiliated technical analysis, not an independent product test.
Author: Dr. Aleksander Stefanowicz
Renewable energy and DeepTech advisor with an engineering background and experience in technology commercialization and strategic B2B partnerships.