A wind-solar microgrid needs enough battery energy to cover a defined deficit and enough battery power to support the required loads. Those are separate requirements. There is no universal storage ratio that can be inferred from the combined turbine and solar capacity.
Start by specifying the job of the battery. Daily energy shifting, short interruptions, generator cycling reduction and prolonged autonomy can require different capacity and control policies. A battery sized to move midday solar into the evening is not automatically adequate for several calm, cloudy days.
Define the load and service requirement
Separate critical loads from loads that can be deferred or disconnected. Record average demand, peaks, starting events and the duration of the required service window. Include the auxiliaries that remain active when the main source fails: controls, communications, cooling and any other equipment necessary for the protected function.
State the availability of backup during the scenario. “Twelve hours of autonomy” means little without explaining whether the grid or generator is assumed unavailable and what renewable generation is credited. A conservative outage calculation may assume no renewable contribution during that window, while a chronological model can assess a wider range of actual sequences.
The supplied EAAS pages 7–9 contain configurations with storage, but they are illustrative scenarios. Their battery values should not be copied to a different load. Nor should the separate cases be combined into a single apparent product specification.
Convert delivered energy into nameplate capacity
For a simple illustration, assume a constant 2 kW critical load for 12 hours. Required delivered energy is 24 kWh. Assume that 80% of installed battery capacity is available within the permitted operating window and that the discharge path delivers 90% of withdrawn energy to the load. Initial nameplate capacity would be 24 ÷ (0.80 × 0.90), or approximately 33.3 kWh.
Now require the same service at an illustrative end-of-life retained capacity of 80%. The corresponding initial capacity becomes 24 ÷ (0.80 × 0.90 × 0.80), or about 41.7 kWh. These percentages are assumptions for teaching the calculation, not recommendations for a chemistry or product. Actual limits come from the equipment and design basis.
Keep the factors distinct. The operating window, conversion losses and retained capacity describe different effects. A reserve already excluded from the usable window should not be deducted again. Temperature, auxiliary consumption and site conditions may require further treatment, but each adjustment needs a stated rationale.
Check power, charging and recovery
Energy capacity does not prove that the battery can supply the peak load. Verify discharge power, duration, converter rating and transient requirements. Likewise, verify charging power and the time needed to restore reserves after an event. A large battery with a weak replenishment source can remain depleted when the next outage arrives.
For example, restoring 24 kWh of delivered reserve using only 3 kW of available charging power takes longer than eight hours once losses and competing loads are considered. If renewable surplus occurs for only a few hours, the site may need another recovery strategy. This is why storage sizing and generation sizing must be solved together.
Required delivered energy: the load integrated over the specified service period.
Usable energy: the portion allowed by operational limits and reserve policy.
Power capability: the discharge and charge rates the system can support.
Recovery requirement: how and when the reserve will be restored.
Aging allowance: the capacity and power required later in service life.
Use chronological simulation for the final decision
Combine timestamped wind, solar and demand with a battery model and explicit dispatch rules. Track state of charge, unmet load, curtailment, backup starts and energy losses. Run representative seasonal conditions and stressed sequences, including coincident low wind and solar. Annual renewable energy exceeding annual demand does not demonstrate autonomy.
Wind can reduce storage requirements if it supplies useful energy during solar deficits, but the effect is site-dependent. The complementarity article explains why timing matters. Increasing battery size may absorb more surplus, yet eventually additional capacity may be rarely used or inadequately replenished.
Choose a capacity against a defined objective
Compare several configurations using the same reliability criterion and lifecycle boundary. Include replacement, service, controls, installation and the economic value of reduced backup use. Distinguish the lowest-cost solution from the solution offering the longest specified autonomy. They may be different choices for good reasons.
The existing overview of hybrid microgrids connects these design decisions. A defensible battery size is a documented answer to a particular load, resource and service requirement. Its value lies in meeting that requirement through real operating conditions, rather than in presenting the largest possible kilowatt-hour figure.
Source notes: MOVEAIR - EAAS TELCO.pdf (EAAS); MOVEAIR Wind Powered Infrastructures.pdf (WIND18). PDF references: EAAS pp7-9; WIND18 p15. These supplied manufacturer materials describe proposals, examples and product generations; they are not independent verification of current performance. Calculations explicitly labelled illustrative are analytical examples.
Image: Storage and power-equipment detail from the supplier’s hybrid-site concept rendering; not a photograph of a verified installation. Source: EAAS, PDF p10.
By Dr. Aleksander Stefanowicz. Disclosure: Aleksander Stefanowicz has a professional relationship with MOVEAIR. This is an affiliated technical analysis, not an independent product test.
Author: Dr. Aleksander Stefanowicz
Renewable energy and DeepTech advisor with an engineering background and experience in technology commercialization and strategic B2B partnerships.
Disclosure: supplied MOVEAIR materials identify him as a MOVEAIR Energy Global Partner. Supplier-related analysis reflects this professional relationship.