Small Wind Due Diligence: 15 Questions Before Signing

Editorial production: Weimpa Inc. · Expert collaboration: Aleksander Stefanowicz
GreenTech Commercialization
Ask for site-specific resource evidence, a defined product configuration, integration responsibility and a complete commercial scope before committing to small wind.
Small-wind due diligence works best as an information request tied to a decision. Broad questions such as whether a turbine is efficient or reliable invite broad answers. The useful questions identify a document, measurement boundary or contractual responsibility that a buyer can verify.
The supplied MOVEAIR materials emphasize site assessment and pilots. They help frame the questions below, but a supplier presentation cannot answer every question for a particular installation. This checklist is an engineering and commercial review aid; it does not imply that any named supplier has failed these tests.
Resource and expected energy
1. What wind data represents the proposed rotor location? Request measurement height, location, period, missing-data treatment and nearby obstacles. If the estimate comes from a map or a distant station, ask how the supplier translated it to the actual site and how much uncertainty that introduces.
2. Which power curve and equipment version support the forecast? Obtain the curve, its measurement or modeling basis and the exact turbine, controller and electrical boundary. A curve from another product generation should not be silently substituted into the current offer.
3. How does gross generation become useful delivered energy? Ask for separate allowances for conversion, wiring, availability, storage and curtailment. Request a reconciliation that shows where each kWh goes, with no loss counted twice and no unusable surplus valued as avoided consumption.
4. What changes the forecast most? Request a sensitivity range for resource, exposure, operating limits and downtime. A single annual figure without an uncertainty explanation is difficult to use for a capital decision, even when the arithmetic is correct.
5. How will the forecast be checked after installation? Agree meters, timestamps, access to raw data and the comparison method. Define how weather differences and missing data will be handled before performance is assessed, rather than negotiating the method after the result is known.
Product, structure and integration
6. What exactly is being supplied? Ask for a bill of materials and controlled configuration covering turbine, mount, converter, protection and software. Distinguish available equipment from planned upgrades, prototypes and optional features. The final purchase scope should identify substitutions that require approval.
7. What evidence supports the stated operating limits? Request relevant test reports and their scope, including the configuration tested and any conditions or exclusions. A headline survival speed or certification statement is insufficient without the underlying product and installation context.
8. Who accepts the structural design? Identify the responsible engineer, required as-built information and analysis of the support, connections and host structure. A mounting concept that fits physically does not establish structural suitability or long-term fatigue performance at another site.
9. Who owns the electrical interface? Request a documented connection boundary, protection concept, control hierarchy and commissioning responsibilities. Confirm what happens when the turbine, converter, battery or communications system faults. Avoid a gap between separate equipment warranties.
10. How will installation and maintenance actually occur? Ask for access requirements, lifting arrangements, isolation, replacement procedures and expected visit scope. Check compatibility with the host asset’s operations. A low-maintenance component can still be expensive to reach and replace.
Economics and operating responsibility
11. Does the quotation cover a working installation? Separate equipment, delivery, mounting, engineering, integration and commissioning. Request explicit exclusions and site assumptions. Compare competing offers on the same boundary before interpreting a price difference as a technology advantage.
12. What operating and replacement costs are assumed? Obtain service scope, travel charges, consumables, monitoring fees and major replacement assumptions. Ask which costs are fixed, which depend on output and which arise only after a fault. Treat uncertain replacement timing as a scenario.
13. Which savings are measured, modeled or merely targeted? Request the baseline behind fuel or electricity savings and distinguish trial results from forecasts. For a financial model, identify energy prices, escalation, discounting and any incentives. A payback number without those inputs is not auditable.
14. What happens when performance or service falls short? Review the relevant warranty or service terms, response responsibilities, exclusions and remedies with the appropriate professionals. Determine who pays for access and diagnosis. Do not assume a component replacement promise covers lost energy or operational disruption.
15. What evidence permits rollout or exit? Agree acceptance criteria, the owner of the decision and the treatment of unresolved items. Define removal, handover, data access and equipment ownership at the end of a pilot or service arrangement. These details shape the practical cost of changing direction.
Turn answers into a decision register
For each question, record the evidence received, its version, the responsible person and whether it closes the issue. Distinguish a missing document from an unfavorable result: they require different actions. A supplier response can also legitimately identify a site-specific engineering task that remains to be commissioned.
Prioritize gaps that could change eligibility, energy value or service continuity. The objective is a defensible decision with clear responsibilities, not a larger folder of brochures. The pilot procurement guide explains how to convert the unresolved questions into a bounded test.
Source notes: MOVEAIR - Use Case Studies.pdf (CASE); MOVEAIR Wind Powered Infrastructures.pdf (WIND18); MOVEAIR - EAAS TELCO.pdf (EAAS). PDF references: CASE p2; WIND18 p14; EAAS p13. These supplied manufacturer materials describe proposals, examples and product generations; they are not independent verification of current performance. Calculations explicitly labelled illustrative are analytical examples.
Image: Planning photograph included in the supplier material; illustrative due-diligence context, not a record of the author’s meeting. Source: EAAS, PDF p13.
By Dr. Aleksander Stefanowicz. Disclosure: Aleksander Stefanowicz has a professional relationship with MOVEAIR. This is an affiliated technical analysis, not an independent product test.
Author: Dr. Aleksander Stefanowicz
Renewable energy and DeepTech advisor with an engineering background and experience in technology commercialization and strategic B2B partnerships.
Disclosure: supplied MOVEAIR materials identify him as a MOVEAIR Energy Global Partner. Supplier-related analysis reflects this professional relationship.