Levelized cost of energy, or LCOE, expresses the lifetime cost of a system per unit of energy over a defined analysis period. For a hybrid microgrid, it can help compare complete configurations when their boundaries and service requirements are consistent. It does not automatically describe a customer’s tariff, project profitability or the value of resilience.

The denominator deserves as much attention as the cost model. A calculation using all potential renewable generation can look cheaper than one using energy actually delivered to loads. Curtailed output and storage losses cannot be ignored simply because the turbine or solar array produced the energy upstream.

Define the system and the formula

A discounted formulation divides the present value of lifecycle costs by the present value of energy delivered in each year. In compact form: LCOE = sum of Cₜ/(1+r)^t divided by sum of Eₜ/(1+r)^t. Here Cₜ is the cost in year t, Eₜ is delivered energy, and r is the chosen discount rate.

Include initial investment, maintenance, fuel, replacement, service and relevant end-of-life costs within the chosen boundary. Treat residual value consistently. State whether figures are real or nominal and align the discount rate and escalation assumptions accordingly. Financing should be modeled coherently; adding every financing charge and a separate investor return without a clear method can double-count costs.

For a microgrid comparison, hold the critical-load requirement and reliability criterion constant. A low-cost configuration that leaves more demand unmet is not directly equivalent to one that meets the service requirement. Report unmet energy and other reliability outcomes alongside LCOE.

Work through a simplified discounted example

Consider a purely illustrative system with EUR 100,000 initial investment, EUR 5,000 annual operating and fuel costs, and EUR 20,000 replacement expenditure at the end of year 10. Assume 30,000 kWh delivered annually for 20 years, a real discount rate of 5%, no degradation and no residual value. These inputs are not a supplier quote or site forecast.

The present-value factor for a constant end-of-year annual amount over 20 years at 5% is approximately 12.462. Annual operating costs therefore have a present value of about EUR 62,311. The year-10 replacement has a present value of about EUR 12,278. Total discounted cost is approximately EUR 174,589.

Discounted delivered energy is 30,000 × 12.462, or approximately 373,866 kWh. Dividing cost by energy gives an illustrative LCOE of about EUR 0.467/kWh. Rounding explains minor differences if the calculation is repeated with more decimal places. The result is meaningful only within the assumptions just stated.

Show why a simple average differs

Ignoring discounting, the same example costs EUR 100,000 + 20 × EUR 5,000 + EUR 20,000 = EUR 220,000. Dividing by 600,000 kWh gives approximately EUR 0.367/kWh. This is a simplified lifetime cost per kilowatt-hour, not the discounted LCOE above.

The difference is not an arithmetic error. Initial investment occurs immediately while most energy arrives later. Discounting changes their relative weights. This is why two reported “LCOE” figures should not be compared until their definitions, timing and boundaries are understood.

The supplied EAAS pages 8 and 9 show separate scenarios and cost figures. Their inputs should not be merged. The savings and payback annotation on page 9 also mixes inconsistent load and arithmetic assumptions, so it is not used as a project result here. A transparent new example is more useful than repeating an unreproducible headline.

Test the assumptions that can change the ranking

At minimum, vary delivered energy, capital cost, fuel use, replacement timing and the discount rate. If delivered energy falls by 20% while costs remain unchanged, LCOE rises by 25%, because the same cost is divided by 80% of the energy. This relationship helps identify why yield and curtailment assumptions deserve scrutiny.

  • Use energy delivered at one agreed boundary throughout the model.

  • Include replacement intervals supported by the intended operating duty.

  • Keep fuel assumptions consistent with chronological dispatch.

  • Distinguish planned service from unplanned repair and access costs.

  • Report the treatment of degradation, taxes, residual value and decommissioning.

For storage-intensive systems, evaluate whether additional capacity reduces backup cost enough to justify its lifecycle cost. The battery-sizing article explains why storage capacity alone does not determine delivered service.

Use LCOE alongside the commercial decision

A project also needs an assessment of cash flow, contract structure, risk and service value. A customer may rationally pay more for improved continuity or fewer remote service visits, but those benefits should be described explicitly. They should not be hidden by selectively changing the LCOE boundary.

The existing overview of hybrid microgrids provides the system context. LCOE is strongest as a reproducible comparison metric: the reader can inspect the costs, energy, timing and service requirement, then understand why one configuration differs from another.

Source notes: MOVEAIR - EAAS TELCO.pdf (EAAS). PDF references: EAAS pp8-9. These supplied manufacturer materials describe proposals, examples and product generations; they are not independent verification of current performance. Calculations explicitly labelled illustrative are analytical examples.

Image: Container, wind and solar configuration depicted in the supplier material; it does not verify a quoted LCOE. Source: EAAS, PDF p5.

By Dr. Aleksander Stefanowicz. Disclosure: Aleksander Stefanowicz has a professional relationship with MOVEAIR. This is an affiliated technical analysis, not an independent product test.

Author: Dr. Aleksander Stefanowicz

Renewable energy and DeepTech advisor with an engineering background and experience in technology commercialization and strategic B2B partnerships.

Disclosure: supplied MOVEAIR materials identify him as a MOVEAIR Energy Global Partner. Supplier-related analysis reflects this professional relationship.

Connect with Aleksander on LinkedIn

Contact

Let’s connect

Connect on LinkedIn to discuss renewable energy, DeepTech and strategic partnerships.

Contact

Let’s connect

Connect on LinkedIn to discuss renewable energy, DeepTech and strategic partnerships.

Contact

Let’s connect

Connect on LinkedIn to discuss renewable energy, DeepTech and strategic partnerships.